This project was a real challenge, logistically, linguistically and above all – thermally.
The equipment was installed in a 12 m high hall, unused for over 20 years, located in the port area of Burgas. All the installation work took place in February, at an average indoor temperature of below zero degrees.
The equipment configuration is complete, washing-assembling-press line and sealing robot, bender, silica gel filling plant, butyl extruder and column crane and suction device.
Thank you EFG BUILD, especially Mr. Ertan for trusting Semper Fi Glass experts